Możliwości zastosowania elektrycznego podgrzewacza wody w układach technologicznych elektrowni i elektrociepłowni

Authors

[ 1 ] Instytut Elektroenergetyki, Wydział Inżynierii Środowiska i Energetyki, Politechnika Poznańska | [ P ] employee

Scientific discipline (Law 2.0)

[2.10] Environmental engineering, mining and energy

Title variant

EN Possibilities of using an electric water heater in the technological systems of power plants and combined heat and power plants

Year of publication

2025

Chapter type

chapter in monograph

Publication language

polish

Keywords
PL
  • elastyczność elektrowni
  • podgrzewacz elektryczny
  • elektrownia parowa
  • elektrociepłownia parowa
EN
  • power plant flexibility
  • electric heater
  • steam power plant
  • steam cogeneration plant
Abstract

PL W pracy przedstawiono wyniki analiz nad możliwościami zastosowania elektrycznego podgrzewacza wody do poprawy elastyczności pracy jednostek wytwórczych. Rozważono dwa scenariusze modernizacji odpowiednio bloków jednostek elektrownianych oraz jednostek kogeneracyjnych. W pierwszym scenariuszu analizie poddano możliwości zastosowania elektrycznego podgrzewacza wody zasilającej w blokach parowych w celu poprawy ich regulacyjności w systemie elektroenergetycznym. Porównano możliwość poprawy regulacyjności bloku 200 MW z blokami o wyższych wartościach mocy znamionowej. Następnie przeanalizowano możliwości zmniejszenia wskaźnika emisji CO2 poprzez nadbudowanie bloku parowego o mocy 200 MW turbiną gazową.

EN The paper presents the results of analyses of the possibilities of using an electric water heater to improve the flexibility of power plants. Two scenarios of modernization of power and cogeneration plants were considered, respectively. In the first scenario, the possibilities of using an electric feed water heater in steam power plants were analyzed to improve their flexibility in the power system. The possibilities of enhancing the controllability of a 200 MW unit were compared with units with higher nominal power. Then, the possibilities of reducing the CO2 emission factor were analyzed by adding a gas turbine to the 200 MW steam unit. In the second variant, an analysis of the possibilities of using an electric network water heater in a combined heat and power plant system with a back-pressure steam turbine was carried out to examine the possibilities of heat production in periods of low electricity demand. Based on the simulation studies, the results necessary for conducting economic analyses of individual solutions were obtained to determine the profitability of modernization of generating and cogeneration units according to the proposed concepts.

Pages (from - to)

71 - 80

DOI

10.33223/ZN/2025/07

URL

https://se.min-pan.krakow.pl/pelne_teksty37/monografia_ZN_IGSMiE113_po37K.pdf#page=73

Book

Zagadnienia surowców energetycznych i energii w gospodarce krajowej. Nowe strategie i inwestycje na rynku paliw i energii w kraju i UE

License type

CC BY-SA (attribution - share alike)

Open Access Mode

publisher's website

Open Access Text Version

final published version

Full text of chapter

Download file

Access level to full text

public

Ministry points / chapter

20

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.