Depending on the amount of data to process, file generation may take longer.

If it takes too long to generate, you can limit the data by, for example, reducing the range of years.

Article

Download file Download BibTeX

Title

Optimizing plant’s maintenance cost using strategic switching approach

Authors

Year of publication

2013

Published in

Research in Logistics & Production

Journal year: 2013 | Journal volume: vol. 3 | Journal number: no. 3

Article type

scientific article

Publication language

english

Keywords
EN
  • maintenance
  • strategy
  • optimality
  • scheduling
  • deterioration
  • switching
  • plant
Abstract

EN Inadequate supply of public electricity in Nigeria has affected the productivity of many manufacturing industries. Electric generating plant is being used as a standby supplement to public electricity at outage hours. The high cost of running and maintenance of this generating plant has adversely affected the sustainability of the industry. A maintenance strategic switching approach was developed to minimize the cost of running the electric generating plant in the industries. Maintenance strategic switching and cost control parameters are preventive, repair/corrective and replacement. The maintenance cycle for each of the components served as tool for the determination of cumulative sum of maintenance cost from which the minimum cost schedule was selected. Data collected on power machinery from a water generating company was used to test the model. The least probability of failure (non-progressive deterioration) for components was recommended for adoption. There was a significant saving in maintenance cost of components under the non-progressive deterioration. In the 750 schedule, while the cost of maintenance with progressive deterioration was N149, 677, that of non-progressive, least failure probability was N75, 960.35 with savings of 49.25% over the former. Therefore, most economic schedule was 750 cycles. This scheme predicted for the organization the optimal maintenance strategy to utilize.

Pages (from - to)

193 - 212

Full text of article

Download file

Access level to full text

public

Ministry points / journal

8

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.