Depending on the amount of data to process, file generation may take longer.

If it takes too long to generate, you can limit the data by, for example, reducing the range of years.

Article

Download file Download BibTeX

Title

Closed loop supply chain with production planning

Authors

Year of publication

2016

Published in

Research in Logistics & Production

Journal year: 2016 | Journal volume: vol. 6 | Journal number: no. 2

Article type

scientific article

Publication language

english

Keywords
EN
  • closed loop
  • supply chain
  • optimization
  • production planning
Abstract

EN We present a Closed Loop Supply Chain (CLSC) model that supports a production planning (PP) process. CLSC model is based on CLSC framework model which consists of four main centers: collection, recovery center, distribution and disposal centers. These logistics parts support main production lines. Some quantity of the products is recovered and the factories don’t need to spend money for production. This is a simple cost reduction process. In CLSC literature one can hardly meet the models of production planning processes supported by CLSC. Important problem with that models is the computational complexity when one wants to prepare production plans for more than one time period. This is connected with a number of the numerical variables of the CLSC and PP models which are usually Integer Programming models solved with Branch & Bound algorithms. We present some modifications of the widely known and used constraints in the CLSC models to optimize solving process. All the experiments were conducted with the CPLEX solver.

Pages (from - to)

117 - 128

DOI

10.21008/j.2083-4950.2016.6.2.2

Full text of article

Download file

Access level to full text

public

Ministry points / journal

8

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.