Depending on the amount of data to process, file generation may take longer.

If it takes too long to generate, you can limit the data by, for example, reducing the range of years.

Article

Download file Download BibTeX

Title

Analysis of influence of metal components manufacturing on assembly of refrigeration equipment

Authors

Year of publication

2016

Published in

Research in Logistics & Production

Journal year: 2016 | Journal volume: vol. 6 | Journal number: no. 4

Article type

scientific article

Publication language

english

Keywords
EN
  • production system
  • production schedule
  • sheet processing
Abstract

EN Systemic approach allows to see the production enterprise as a complex system of production and auxiliary facilities. In process approach, manufacturing makes the stream of materials flow through individual production cells in a mixed (serial – parallel) system, in a discreet way (in steps). Processing times are different at each stage. Element that connects individual production facilities are interoperable landfills, which perform the functions of semis storage departing from object N and magazine of deliveries for the next (N + 1) or another station. Chart flow of deliveries and acceptances at the time takes the stepped form. Parameters of steps depend on the processing time and batch size. In the actual manufacturing process (even in the long term), lines of supply and efficiency do not run parallel. The analyzed plant consists of 9 stations and buffers (warehouses). The process of manufacturing of the refrigeration appliance has a socket structure. An important part of the production is suitable schedule for the preparation of components and assembly.

Pages (from - to)

351 - 360

DOI

10.21008/j.2083-4950.2016.6.4.7

Full text of article

Download file

Access level to full text

public

Ministry points / journal

8

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.