Depending on the amount of data to process, file generation may take longer.

If it takes too long to generate, you can limit the data by, for example, reducing the range of years.

Article

Download file Download BibTeX

Title

PERT method in material’s flow continuity improvement in convergent production structure

Authors

Year of publication

2018

Published in

Research in Logistics & Production

Journal year: 2018 | Journal volume: vol. 8 | Journal number: no. 2

Article type

scientific article

Publication language

english

Keywords
EN
  • beta-PERT distribution
  • PERT
  • production system
Abstract

EN In the article there is a presentation of PERT method in calculation of production tasks beginning time. Main aim was to point out activities which determine production’s beginning in convergent production system.In analysis there was an usage of complex systems theory and there were several stages of decomposition into single production streams. In the work there is a presentation of a model which sets the moment of production processes beginning in a production structure which is characterized by high level of processes’ repetitions with different production parameters.

Pages (from - to)

143 - 153

DOI

10.21008/j.2083-4950.2018.8.2.2

Full text of article

Download file

Access level to full text

public

Ministry points / journal

8

Ministry points / journal in years 2017-2021

8

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.