Depending on the amount of data to process, file generation may take longer.

If it takes too long to generate, you can limit the data by, for example, reducing the range of years.

Article

Download file Download BibTeX

Title

Batch scheduling in a two-stage flexible flow shop problem

Authors

Year of publication

2014

Published in

Foundations of Computing and Decision Sciences

Journal year: 2014 | Journal volume: vol. 39 | Journal number: no. 1

Article type

scientific article

Publication language

english

Keywords
EN
  • deterministic scheduling
  • flexible flowshop
  • batch scheduling
Abstract

EN We study a special two-stage flexible flowshop, which consists of several parallel identical machines in the first stage and a single machine in the second stage. We assume identical jobs, and the option of batching, with a required setup time prior to the processing of a new batch. We also consider the option to use only a subset of the available machines. The objective is minimum makespan. A unique optimal solution is introduced, containing the optimal number of machines to be used, the sequence of batch sizes, and the batch schedule. The running time of our proposed solution algorithm is independent of the number of jobs, and linear in the number of machines.

Pages (from - to)

3 - 16

DOI

10.2478/fcds-2014-0001

URL

https://sciendo.com/article/10.2478/fcds-2014-0001

License type

CC BY-NC-ND (attribution - noncommercial - no derivatives)

Full text of article

Download file

Access level to full text

public

Ministry points / journal

15

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.