Depending on the amount of data to process, file generation may take longer.

If it takes too long to generate, you can limit the data by, for example, reducing the range of years.

Chapter

Download BibTeX

Title

Modeling performance of a production line and optimizing its efficiency by means of genetic algorithm

Authors

[ 1 ] Instytut Technologii Mechanicznej, Wydział Budowy Maszyn i Zarządzania, Politechnika Poznańska | [ P ] employee

Year of publication

2014

Chapter type

paper

Publication language

english

Abstract

EN A production line is a fundament of modern high scale FMCG industry. The performance of the line depends on various factors, out of which breakdowns, cleanings and changeovers play the most important role. The paper describes the idea of modeling production line performance by its decomposition into discrete subsystems. Every machine or workstation together with preceding buffer constitute a single subsystem, which is characterized by statistical distributions of time to repair, time between failures, processing speed and capacity. Time dedicated for cleaning and changing format parts between different production batches is also considered in the model. Subsystems are connected with each other by conveyors. The model was simulated by the given time step. In order to verify the simulation results, the data from the real production line were compared and used for adjusting the parameters of the model. The described specimen consisted of six workstations connected with conveyors. There was one high capacity buffer between the second and third station. The efficiency of the whole line as well breakdown time characterizing every machine was captured by data acquisition system. Based on the given data, the parameters of statistical distributions of time to repair and time between failures were estimated by approximation to known distributions. In addition, statistical distributions of cleaning and changeover time were derived in order to provide general performance of the production line. Genetic algorithm was introduced to optimize the line parameters in order to achieve higher efficiency and to identify potential bottlenecks.

Pages (from - to)

1 - 6

DOI

10.1115/ESDA2014-20141

URL

https://asmedigitalcollection.asme.org/ESDA/proceedings-abstract/ESDA2014/45851/V003T10A004/228124

Comments

Paper No. ESDA2014-20141

Book

Proceedings of the ASME 2014 12th Biennial Conference on Engineering Systems Design and Analysis ESDA 2014. Vol. 3, Copenhagen, Denmark, June 25-27, 2014

Presented on

12th ASME Biennial Conference on Engineering Systems Design and Analysis ESDA2014, 25-27.06.2014, Copenhagen, Denmark

Publication indexed in

WoS (15)

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.