Depending on the amount of data to process, file generation may take longer.

If it takes too long to generate, you can limit the data by, for example, reducing the range of years.

Article

Download BibTeX

Title

On-Site Testing and Diagnosis of Transmission Power Cables up to 230kV Using Damped AC Voltages

Authors

[ 1 ] Instytut Elektroenergetyki, Wydział Elektryczny, Politechnika Poznańska | [ P ] employee

Year of publication

2014

Published in

IEEE Electrical Insulation Magazine

Journal year: 2014 | Journal volume: vol. 30 | Journal number: no. 3

Article type

scientific article

Publication language

english

Keywords
EN
  • transmission power cable
  • after-laying testing
  • maintenance
  • damped AC voltage
  • partial discharge detection
  • dielectric dissipation factor
  • condition assessment
  • asset management
Abstract

EN Failures of the insulation of HV power cables can occur during operation at normal voltage or as a result of a transient voltage spike due to lightning or switching. Failures may occur if localized electrical stresses exceed the dielectric strength of the insulation or if the insulation is degraded to the point that it cannot withstand the applied voltage.

Pages (from - to)

27 - 38

DOI

10.1109/MEI.2014.6804739

URL

https://ieeexplore.ieee.org/document/6804739

Ministry points / journal

30

Impact Factor

1,643

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.