Depending on the amount of data to process, file generation may take longer.

If it takes too long to generate, you can limit the data by, for example, reducing the range of years.

Chapter

Download BibTeX

Title

Partial discharge measurements as a source of information about the technical condition of PILC insulated MV cables

Authors

[ 1 ] Instytut Elektroenergetyki, Wydział Elektryczny, Politechnika Poznańska | [ P ] employee

Year of publication

2013

Chapter type

paper

Publication language

english

Abstract

EN The paper focuses on the new possibilities of managing a key element of the power supply system: the power cable network. The possibilities are created by the technical condition assessment of power cables based on partial discharge diagnosis at damping (self-extinguishing) AC voltage. Both cable manufacturers and their users pursue to obtain a high technical reliability of the power network. Modern IT and measurement systems make it possible to acquire data enabling a better assessment of the line technical condition. Undoubtedly, among the new data sources there is also diagnostics based on partial discharge (PD) measurement (PD inception voltage, PD extinguishing voltage, the PD apparent charge value for different voltage levels, PD intensity, PD distribution as a function of cable length). Providing a unique data set which describes an insulation technical condition of particular line elements, such a diagnostics creates an opportunity to change the current method of power cable network management to a new more effective one, both technically and economically. Measurements of partial discharges in MV cable network were carried out in one of the distribution companies in Poland in the years 2005-2010. They were intended to develop an optimal method for the use of partial discharges diagnosis in the assessment of technical condition of power cables. The main area of research covered MV cable lines of a total length of 590 km. The studies on power cables provided a group of measurements for Paper Insulated Lead Covered power cables (PILC). From all the measurements there were selected 18 cases where a cable failure was recorded and the measurements of partial discharges were carried out both before the failure and immediately after the repair of the failure. Basing on the carried research work and analysis it has been found.

Pages (from - to)

0383-1 - 0383-5

DOI

10.1049/cp.2013.0702

URL

https://ieeexplore.ieee.org/document/6683305

Comments

paper number: 0383

Book

22nd International Conference and Exhibition on Electricity Distribution (CIRED 2013), Stockholm, 10-13 June, 2013

Presented on

22nd International Conference and Exhibition on Electricity Distribution (CIRED 2013), 10-13.06.2013, Stockholm, Sweden

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.