Depending on the amount of data to process, file generation may take longer.

If it takes too long to generate, you can limit the data by, for example, reducing the range of years.

Article

Download file Download BibTeX

Title

Structure in big skew - Gladsaxe case Denmark

Authors

Year of publication

2017

Published in

Archiwum Instytutu Inżynierii Lądowej

Journal year: 2017 | Journal number: nr 23

Article type

scientific article

Publication language

english

Keywords
EN
  • buried steel structures
  • underpass
  • big skew
Abstract

EN This paper presents how to solve the end treatment for buried steel structure designed initially in an incorrect way. Structure VR9 with span of 4.77m and rise of 3.83m was designed with skew of 28 degree with beveled end cut 1:1.5. Due to heavy loads LM1 LL vehicle the cut end would be subjected to huge deformations. The solution of the problem required the designing of: geogrids to reduce the horizontal active pressure and the 3D concrete frame to carry the vertical loads (soil and traffic). Fem 3D analysis and final solution of cut end reinforcement will be presented in this paper.

Pages (from - to)

279 - 286

DOI

10.21008/j.1897-4007.2017.23.25

Presented on

3rd European Conference on Buried Flexible Steel Structures, 24-25.04.2017, Rydzyna, Polska

License type

CC BY-SA (attribution - share alike)

Full text of article

Download file

Access level to full text

public

Ministry points / journal

4

Ministry points / journal in years 2017-2021

4

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.