Depending on the amount of data to process, file generation may take longer.

If it takes too long to generate, you can limit the data by, for example, reducing the range of years.

Article

Download BibTeX

Title

Sprężenie zewnętrzne i odbudowa wieloprzęsłowego ciągłego mostu zespolonego nad Dunajcem w Zakliczynie

Authors

Title variant

EN External post-tensioning and rebuilding of multispan, continuous, composite bridge over Dunajec river in Zakliczyn

Year of publication

2013

Published in

Archiwum Instytutu Inżynierii Lądowej

Journal year: 2013 | Journal number: nr 16

Article type

scientific article

Publication language

polish

Abstract

EN The paper describes the rebuilding of multi - span, continuous, composite bridge, located along road nr 975 over Dunajec River in Zakliczyn city (Małopolska Voivodeship). The investment is implemented in “design - build” system and BANIMEX Sp. z o. o. is a main contractor. The investement was divided into two stages. This paper presents the second one, where the main task was to strengthen the structure and replace the equipment including road surface. A project of the second stage was delivered by the design office PROMOST Wroclaw sp. z o.o. Sp. k. The paper focuses on strengthening of steel - concrete composite bridge structure. The analyses of several solutions ware performed. The designer in cooperation with the main contractor and investor decided to apply strengthening in the form of three main technical components: 1) new composite reinforced slab, 2) passive strengthening: steel sheets on the bottom of the girders flanges and longitudinal ribs in the area of a bridge piers, 3) active strengthening: external post-tensioning using straight cables.

Pages (from - to)

23 - 35

Ministry points / journal

4

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.