Article

Download file Download BibTeX

Title

Feasibility Study for Project of Agrophotovoltaic System Based on the Existing Solar Power Plant

Authors

[ 1 ] Instytut Elektrotechniki i Elektroniki Przemysłowej, Wydział Automatyki, Robotyki i Elektrotechniki, Politechnika Poznańska | [ P ] employee

Title variant

UK Tehnìko-ekonomìčnij analìz proêktu agrofotovolt'aïčnoï sistemi na bazì ìsnuûčnoï elektrostancïï

Year of publication

2022

Published in

Energy Engineering and Control Systems

Journal year: 2022 | Journal volume: vol. 8 | Journal number: no. 2

Article type

scientific article

Publication language

english

Keywords
EN
  • agrophotovoltaic system
  • solar power plant
  • work modes
  • powergrid
  • feasibility study
Abstract

EN The object of the research is an agrophotovoltaic system. An analysis of the operating conditions of one of the existingsolarpower plants was performedand limitations of electricity generation due to its excess in the power system or due to work moderestrictions both under the normal state of the power grid and under individual emergency or repair modes were identified. This leads to an underproductionof electricity and a decrease in the efficiency of using the installed capacity of thesolar power plant(SPP). Therefore, it was proposed to introduce an agrophotovoltaic system, which allows for more efficient use of land resources, it also allows us toincrease the yield of agricultural crops that can be planted on the territory of a solarpower plant, to eliminate restrictions on the delivery of generated power to the power grid through its direct consumption at the site of the SPP. The feasibility studyof the project of an agrophotovoltaic system based on the existing power plant shows that its payback period will not exceed 3 years, and the profit for the 5th year of exploitationof such a system will be up to €279409.

Pages (from - to)

73 - 80

DOI

10.23939/jeecs2022.02.073

URL

https://science.lpnu.ua/jeecs/all-volumes-and-issues/volume-8-number-2-2022/feasibility-study-project-agrophotovoltaic

Full text of article

Download file

Access level to full text

public

Ministry points / journal

5

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.