The Impact of Degradation of PV/Battery-Independent System Components on Technical and Economic Indicators and Sizing Process

Authors

[ 1 ] Instytut Elektroenergetyki, Wydział Inżynierii Środowiska i Energetyki, Politechnika Poznańska | [ P ] employee

Scientific discipline (Law 2.0)

[2.10] Environmental engineering, mining and energy

Year of publication

2023

Published in

Energies

Journal year: 2023 | Journal volume: vol. 16 | Journal number: iss. 18

Article type

scientific article

Publication language

english

Keywords
EN
  • battery
  • long-term reliability
  • off-grid
  • photovoltaics
  • sizing
Abstract

EN This article presents research on modelling the operation of an independent electricity generation system consisting of a photovoltaic installation and energy storage in the form of electrochemical batteries (PV/BAT). The generation system was considered primarily in the context of its sizing process, i.e., the selection of the installed power of the photovoltaic installation (PV) and the rated capacity of the battery (BAT). Traditionally, the model includes a one-year analysis of the generation system based on initial (nominal) parameters without considering component performance degradation. The novelty of this research lies in the long-term simulation of the system operation, considering the degradation of its components. The sizing process was based on the numerical method. The best solution is selected on the basis of the economic criterion, while satisfying the reliability condition. The simulations were conducted using Matlab software. Using a comparative analysis, the scale of technical and economic oversizing of the system was determined by considering long-term reliability. For the assumed customer load profile, insolation profile, and battery operation in the range of 25–100% of the available capacity, providing the assumed level of reliability after accounting for degradation in the sizing process resulted in a 33.33% increase in the rated battery capacity, an 18.75% increase in the installed photovoltaic plant capacity, and a 19.5% increase in the system cost of electricity (LCOE) relative to the results of the sizing process without accounting for component performance degradation over the years of operation.

Pages (from - to)

1 - 32

DOI

10.3390/en16186642

URL

https://www.mdpi.com/1996-1073/16/18/6642

Comments

article number: 6642

License type

CC BY (attribution alone)

Open Access Mode

open journal

Open Access Text Version

final published version

Date of Open Access to the publication

at the time of publication

Full text of article

Download file

Access level to full text

public

Ministry points / journal

140

Impact Factor

3

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.