Depending on the amount of data to process, file generation may take longer.

If it takes too long to generate, you can limit the data by, for example, reducing the range of years.

Chapter

Download BibTeX

Title

Operation of starting path from Hydro Power Plant Dychów to Thermal Power Plant Dolna Odra – simulation study

Authors

[ 1 ] Instytut Elektroenergetyki, Wydział Elektryczny, Politechnika Poznańska | [ P ] employee

Year of publication

2014

Chapter type

chapter in monograph

Publication language

english

Abstract

EN The system test of bringing voltage and starting power from hydro power plant Dychów (EW Dychów) to thermal power plant Dolna Odra (Elektrownia Dolna Odra) using starting path 110/220 kV, 205 km long, was conducted in early July, 2011; it was preceded and followed by the simulation study carried out using the PSCAD v.4.12 software package (produced by Manitoba HVDC-Canada). With the program, the detailed examination of the electromagnetic and electric-mechanical phenomena in the three-phase configuration can be carried out. The generating units models have been developed referring to detailed data obtained from EW Dychów. In the paper, the simulation results for the starting path in the phase of its development and during the activation of the devices of the block’s auxiliary services in Elektrownia Dolna Odra are presented. The simulation results have been compared to those obtained from the system test.

Pages (from - to)

141 - 152

Book

Safety of the Polish Power System : Edition 2014

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.