Depending on the amount of data to process, file generation may take longer.

If it takes too long to generate, you can limit the data by, for example, reducing the range of years.

Chapter

Download BibTeX

Title

Opportunities to separate an islanded system powered from CHP II Karolin block under wide system breakdown conditions

Authors

[ 1 ] Instytut Elektroenergetyki, Wydział Elektryczny, Politechnika Poznańska | [ P ] employee

Year of publication

2016

Chapter type

chapter in monograph

Publication language

english

Abstract

EN When the catastrophic breakdown of the National Electric Power System (KSE) develops, a separation of the island systems powered from the municipal CHP generating units can be an important way to maintain the CHP’s generation capabilities. The load island of the ECII Karolin CHP’s BC50 block can be formed by loads of the unit auxiliaries and common auxiliaries along with the industrial loads of firms located close to the CHP. In the paper, the selected results of work performed for Veolia Energia Poznań ZEC SA are reported, and the goal of the work was to determine possibilities to automatically separate an island system with BC50 block under the risk of system failure in KSE.

Pages (from - to)

43 - 59

Book

Safety of the Polish Power System : Edition 2016

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.