Depending on the amount of data to process, file generation may take longer.

If it takes too long to generate, you can limit the data by, for example, reducing the range of years.

Article

Download BibTeX

Title

Operation of a BC50 Cogeneration Unit of a CHP Plant in an Isolated Island System

Authors

[ 1 ] Instytut Elektroenergetyki, Wydział Elektryczny, Politechnika Poznańska | [ P ] employee | [ S ] student

Year of publication

2016

Published in

Acta Energetica

Journal year: 2016 | Journal number: nr 1 (26)

Article type

scientific article

Publication language

english

Keywords
EN
  • power system defence and restoration
  • island system separation
  • system experiment
Abstract

EN In a paper presented at the previous APE ‚13 conference [1] results of a concept of separating an island system with a BC50 thermal unit in VEOLIA ENERGY Poznan ZEC SA’s power plant (hereinafter ECII Karolin) were presented. The following loads were selected for supply in the separated island system: EC II Karolin’s auxiliaries and general purpose loads, industrial loads in the plant’s immediate vicinity, and, in the future, municipal consumers. The concept of separation of the island supplied from BC50 unit requires comprehensive verification of the adopted assumptions through system experiments before the appropriate separation automation implementation. The paper presents selected results of the first experiment of the operation of the separated island system with a BC50 unit and the plant’s auxiliaries and general purpose loads plus an external consumer, i.e. a waste water treatment plant in the conurbation of Poznań.

Pages (from - to)

15 - 25

DOI

10.12736/issn.2300-3022.2016102

URL

https://www.actaenergetica.org/index.php/journal/article/view/214

Open Access Mode

open journal

Open Access Text Version

final published version

Ministry points / journal

7

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.