Depending on the amount of data to process, file generation may take longer.

If it takes too long to generate, you can limit the data by, for example, reducing the range of years.

Chapter

Download BibTeX

Title

Control model of energy flow in agricultural biogas plant using SCADA software

Authors

[ 1 ] Instytut Elektrotechniki i Elektroniki Przemysłowej, Wydział Elektryczny, Politechnika Poznańska | [ P ] employee

Year of publication

2016

Chapter type

paper

Publication language

english

Keywords
EN
  • biogas power plant
  • biogas
  • biomass
  • SCADA system
  • renewable energy
Abstract

EN The article presents a model of controlling the flow of energy in agricultural biogas plant. Control model was made on the basis of a shared project biogas power plant. Control algorithm is realized by SCADA software, which enables visualization, manage and an analysis of cost performance of the investment.

Pages (from - to)

1 - 4

DOI

10.1109/CPEE.2016.7738741

URL

https://ieeexplore.ieee.org/document/7738741

Book

Proceedings of “Computational Problems of Electrical Engineering” (CPEE 2016) 14-17th, September, 2016, Sandomierz Poland

Presented on

Computational Problems of Electrical Engineering (CPEE 2016), 14-17.09.2016, Sandomierz, Poland

Publication indexed in

WoS (15)

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.