Depending on the amount of data to process, file generation may take longer.

If it takes too long to generate, you can limit the data by, for example, reducing the range of years.

Article

Download file Download BibTeX

Title

The Circularity of Materials from the Perspective of the Product Life Cycle: A Case Study of Secondary Fence Board, Part 2 (Scenario Analysis)

Authors

[ 1 ] Instytut Transportu, Wydział Inżynierii Lądowej i Transportu, Politechnika Poznańska | [ P ] employee

Scientific discipline (Law 2.0)

[2.7] Civil engineering, geodesy and transport

Year of publication

2024

Published in

Resources

Journal year: 2024 | Journal volume: vol. 13 | Journal number: iss. 4

Article type

scientific article

Publication language

english

Keywords
EN
  • waste management
  • recycling rate
  • recycled content
  • substitution
  • scenarios
Abstract

EN Recycling strategies demonstrate different life cycle environmental performance. In order to assess this performance, a life cycle assessment may be used. In such studies, the recycling should be linked with multifunctionality and allocation. This requires it to be modelled accordingly, especially in terms of environmental burdens and credits. The paper presents a case study of open-loop recycling. A flow of mixed post-consumer multi-material waste was reprocessed into another product with a new application—a fence board made of recycled material (secondary fence board). Although many allocation-related case studies are provided in the literature, no example of a comparison between different substitution scenarios for open-loop recycling has been found. In order to fill the gap, various hypothetical market-mix-based alternatives related to the virgin production and durability of products have been examined. The goal of the study is to assess the potential environmental impact of 1 m2 of secondary fence board modelled in different substitution scenarios. The paper is the second part of a two-part study. In Part 1, life cycle assessment results were presented for a baseline scenario (1A). Part 2 focuses strongly on allocation considerations. In order to ensure a consistency between the results of Part 1 and Part 2, the entire life cycle of the fence board has been taken into account in both calculations. The case study has shown that the results may be highly sensitive to the choice of substitutes and the choice of quality attributes impacting the reference flows (in our example, the durability of products).

Pages (from - to)

52-1 - 52-19

DOI

10.3390/resources13040052

URL

https://www.mdpi.com/2079-9276/13/4/52

Comments

Article number: 52

License type

CC BY (attribution alone)

Open Access Mode

open journal

Open Access Text Version

final published version

Full text of article

Download file

Access level to full text

public

Ministry points / journal

100

Impact Factor

3,6 [List 2023]

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.