Depending on the amount of data to process, file generation may take longer.

If it takes too long to generate, you can limit the data by, for example, reducing the range of years.

Dissertation

Download BibTeX

Title

Odbudowa zdolności wytwórczych elektrowni po awarii katastrofalnej systemu elektroenergetycznego

Authors

[ 1 ] Instytut Elektroenergetyki, Wydział Inżynierii Środowiska i Energetyki, Politechnika Poznańska | [ P ] employee

Promoter

[ 1 ] Instytut Elektroenergetyki, Wydział Inżynierii Środowiska i Energetyki, Politechnika Poznańska | [ P ] employee

Reviewers

Title variant

EN Generation capacity restoration after a catastrophic failure of power system

Language

polish

Keywords
PL
  • elektroenergetyka
  • blackout
  • bezpieczeństwo energetyczne
  • ryzyko
  • AHP
EN
  • power engineering
  • blackout
  • energy safety
  • risk assessment
  • AHP
Abstract

PL W pracy przedstawiono wyniki badań symulacyjnych dla pięciu scenariuszy odbudowy zdolności wytwórczych, zróżnicowanych ze względu na typ źródła rozruchowego. Badania obejmowały dotychczasowe strategie odbudowy, w których źródło rozruchowe stanowią hydrozespoły elektrowni wodnej, turbozespoły gazowe i połączenia transgraniczne, a także nowe strategie, wykorzystujące hybrydowe systemy wytwórcze, złożone z bateryjnych magazynów energii i elektrowni wiatrowych morskich oraz lądowych. Przeprowadzono analizę porównawczą ww. scenariuszy w zakresie zdolności do regulacji napięcia i częstotliwości w torze wydzielonym podczas uruchamiania odbiorów statycznych oraz dynamicznych. Wyniki symulacji zweryfikowane zostały z wynikami rzeczywistej próby systemowej. Ostatecznie, w rozprawie zaproponowano model oceny ryzyka dla rozważanych scenariuszy odbudowy, obejmujący analizę jakościową oraz ilościową z wykorzystaniem metody muchy, a także wielokryterialnej metody AHP oraz FAHP.

EN The thesis presents the results of simulation tests for five scenarios of generation capacity restoration, differentiated by the type of starting source. The research covered the existing restoration strategies, in which the starting source may constitute hydropower plants, gas turbines and cross-border connections, as well as new strategies, using hybrid generation systems, consisting of battery energy storage cooperating with offshore and onshore wind farms. The research carried out a comparative analysis of restoration scenarios in terms of the ability to voltage and frequency regulation in an islanded starting path during the start-up of static and dynamic loads. The simulation results of were supported by the results of the actual system test. Finally, there is proposed a risk assessment model for the considered restoration scenarios, including qualitative and quantitative analysis, basing on bow-tie analysis and AHP and FAHP multi-criteria methods consecutively.

Number of pages

192

Scientific discipline (Law 2.0)

environmental engineering, mining and energy

Signature of printed version

DrOIN 2283

On-line catalog

to2023011170

Full text of dissertation

Download file

Access level to full text

public

First review

Paweł Pijarski

Place

Lublin, Polska

Date

28.07.2023

Language

polish

Review text

Download file

Access level to review text

public

Second review

Paweł Sowa

Place

Gliwice, Polska

Date

27.08.2023

Language

polish

Review text

Download file

Access level to review text

public

Dissertation status

dissertation

Place of defense

Poznań, Polska

Date of defense

10.10.2023

Unit granting title

Rada Dyscypliny Inżynieria Środowiska, Górnictwo i Energetyka Politechniki Poznańskiej

Obtained title

doktor nauk inżynieryjno-technicznych w dyscyplinie: inżynieria środowiska, górnictwo i energetyka

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.