Depending on the amount of data to process, file generation may take longer.

If it takes too long to generate, you can limit the data by, for example, reducing the range of years.

Chapter

Download BibTeX

Title

Determination of the Production Frequency and Batch Size for the Manufacturing Process

Authors

[ 1 ] Instytut Technologii Materiałów, Wydział Inżynierii Mechanicznej, Politechnika Poznańska | [ P ] employee

Scientific discipline (Law 2.0)

[2.9] Mechanical engineering

Year of publication

2021

Chapter type

chapter in monograph / paper

Publication language

english

Keywords
EN
  • production planning
  • production leveling
  • computer simulation
Abstract

EN Production leveling (jap. Heijunka) is an effective method of balancing production and controlling stocks. It also provides an appropriate level of flexibility. This article presented an analysis of the literature on production leveling. In particular, the focus was on definitions, key goals, and methods for implementing leveled production. Also presented is a fragment of research on developing a method for planning the flow of finished products from the production process. The focus was on determining such a variant of the production batch size and production frequency for the selected model of the production process, which, which the given input parameters will get the best results in terms of the degree of order processing and machine load. To achieve the assumed goal, three variants of the production plan were proposed, a computer simulation was created in FlexSim, and the results of the simulation were analyzed.

Date of online publication

05.02.2021

Pages (from - to)

72 - 82

DOI

10.1007/978-3-030-68014-5_8

URL

https://link.springer.com/chapter/10.1007/978-3-030-68014-5_8

Book

Advanced Manufacturing Processes II : Selected Papers from the 2nd Grabchenko’s International Conference on Advanced Manufacturing Processes (InterPartner-2020), September 8-11, 2020, Odessa, Ukraine

Presented on

2nd Grabchenko’s International Conference on Advanced Manufacturing Processes (InterPartner-2020), 8-11.09.2020, Odessa, Ukraine

Ministry points / chapter

20

This website uses cookies to remember the authenticated session of the user. For more information, read about Cookies and Privacy Policy.